iluvfreetools
Site & safety46 of 46

Risk assessments, method statements, SWMS and job hazard analyses, for the UK, US, Australia and Canada. Finished documents, no empty boxes left for you.

All 46 ›
Structure & materials35 of 35

Steel, timber, concrete, brickwork, boards, groundworks and roofs. Section data, indicative sizing, quantities and the reference tables you normally go hunting for.

All 35 ›
Home & property32 of 32

See what it would look like before you commit, then work out what it takes. Upload a photo of your own wall, drive or house and try things on it.

All 32 ›
Invoices & docs20 of 20

Invoices, quotes, receipts and the rest of the paperwork, generated properly. No account, no watermark, and Download is the only button.

All 20 ›
Money & tax39 of 39

Wages, mortgages, tax and the everyday sums. What you actually take home, what it actually costs, and what you actually owe.

All 39 ›
People & hours46 of 46

Rotas, rosters and schedules, holiday and PTO, timesheets and staff paperwork. The admin that eats a Sunday evening, done in ten minutes.

All 46 ›
Business & marketing50 of 50

Starting up, getting found and keeping the admin straight. Everything downloadable, nothing paywalled at the last step.

All 50 ›
PDF & documents27 of 27

Merge, split, crop, sign, number and compress. Everything runs in your browser, so the contract you open here never reaches a server.

All 27 ›
Image tools24 of 24

Convert, resize, compress, crop and adjust. All of it on your own machine, with no upload, no account and no watermark on anything.

All 24 ›
Text & dates20 of 20

Word counts, case, days between dates, working days and ages. The ten-second look-ups, with no account and nothing stored.

All 20 ›
Random & party27 of 27

Secret Santa, draws, brackets, sweepstakes, printables and party quantities. The bit that is just for fun, done properly.

All 27 ›
Training & tests21 of 21

Practice tests for the cards and licences that decide whether you can work. Every answer cites the guidance it came from, not a forum.

All 21 ›

Skip size calculator

Free. No account, no email, nothing uploaded.

The hole. What comes out of it is bigger, and that is worked out below.
The worst of both: bulks by a third and weighs nearly two tonnes a cubic metre wet. Hits the weight limit and the volume limit together.
8 is typical and it varies by vehicle. Being over it does not mean a fine: it means the lorry turns up, cannot pick the skip up, and leaves.
Biggest you can fill 8.1 m³, 11.4 t
6 yd

is the largest that can be filled to the rim with this, at 1.41 tonnes a cubic metre. You need 2 of them.

Every size, and whether it lifts

2 yd
2.2 t full: fine, 6 needed
4 yd
4.3 t full: fine, 3 needed
6 yd
6.5 t full: fine, 2 needed
8 yd
8.6 t full, fill to 93%
12 yd
12.9 t full, fill to 62%
16 yd
17.2 t full, fill to 46%
20 yd
21.5 t full, fill to 37%
40 yd
43.0 t full, fill to 19%

This is heavy waste. A skip company's own calculator will tell you a 12 yard holds it on volume, and then the lorry will not collect it. For soil and rubble the answer is more skips, not a bigger one.

Worth knowing

  • Heavy waste. The biggest skip that can be filled to the top with this is a builders skip, 6 yd. Anything larger gets part filled or does not get collected, and the answer is more skips rather than a bigger one.
  • Excavated ground bulks. 6 cubic metres in the hole comes out as about 8.1 loose, which is what has to fit in the skips.
  • Skips must be level loaded. Anything above the rim is not going on a public road, so the usable volume is to the top edge and not to the top of a heap.

Worked out on this device, by this page. Nothing you typed was sent anywhere or stored, and closing the tab loses it.

Next in the same job

The limit is what the lorry can lift, not what the skip holds

Every skip company has a calculator on its website. Put a bathroom rip-out into one and it will suggest a 12 yard skip, because 12 yards is enough volume.

Then the lorry arrives and cannot pick it up.

A skip lorry lifts the skip off the ground with a hydraulic arm and a chain, and that arm has a working limit: typically around 8 tonnes, varying by vehicle. An 8 yard skip is 6.1 cubic metres, and filled with soil at about 1.4 tonnes a cubic metre that is 8 to 9 tonnes. At or past the limit, with the skip already full and on your drive.

It is not a fine and it is not a rule anybody can waive. It is a hydraulic arm. The lorry tries, fails, and leaves, and you pay for the journey.

For heavy waste the answer is more skips, not a bigger one

This is the whole point of the tool, and it is the opposite of what a volume calculator tells you.

Soil, clay, rubble, concrete, hardcore: all of them hit the lift limit well before they fill a large skip. So the tool lists every size with a verdict against it: what it weighs full, whether that lifts, and if not, how full you can actually fill it.

A 6 yard is generally the biggest that can be filled to the rim with soil, and it is why you see it on groundworks jobs everywhere, mistaken for whatever happened to be available.

And the hole is smaller than the spoil

If you are digging rather than stripping out, there is a second thing stacked on top: excavated ground bulks. Clay comes out about a third bigger than the hole it came from, broken rock by half.

So a 6 cubic metre excavation produces around 8 cubic metres of spoil, weighing 11 tonnes, and it is the 8 that has to fit in skips. The tool does that conversion first and shows you both figures. There is more on bulking here.

Level loaded, always

A skip must be level loaded to travel on a public road. Anything above the rim gets taken off before it goes, or the skip does not go.

Which means the usable volume is the volume to the top edge and not to the top of a heap, and it is why a skip always looks like it should hold more than it does. Every figure on this page is to the rim.

Where skips stop making sense

Past roughly fifteen cubic metres, a grab lorry or a muck away contract is usually cheaper per tonne and does not need road space, a permit and lights for a week.

Skips win on small jobs, on staged jobs where the waste appears over a fortnight, and anywhere a lorry cannot realistically get back twice. Grabs win on volume and on anywhere with room to stand.

Whether you need a permit for the road

Whether you need a permit. On a public road, yes, from the council, usually arranged by the skip company. On your own drive, no. That is a local question and the operator will know it better than any calculator.

Whether the material is contaminated. Made ground can carry a disposal cost that has nothing to do with volume, and skip operators are entitled to refuse it or charge for it separately. If the site has industrial history, that is a question for a lab.

Lift limits and skip volumes here are typical figures. Your operator's are the ones that matter, and the box on the tool is there to put theirs in.

Common questions

What size skip do I need for soil?

Smaller than you think, and this is the thing skip companies’ own calculators get wrong. A skip lorry lifts the skip with an arm that has a limit, typically around 8 tonnes. An 8 yard skip filled with soil is roughly 8 to 9 tonnes, which is at or past it. For soil and rubble the practical answer is a 6 or 8 yard filled part way, or several of them: not a bigger skip.

Why will they not collect my full skip?

Because the lorry physically cannot lift it. It is not a fine or a rule, it is a hydraulic arm and a chain with a working limit. The lorry turns up, tries, and leaves, and you still pay for the wasted journey. Heavy waste in a large skip is the usual cause.

How many cubic metres in a skip?

A cubic yard is 0.765 cubic metres, so a 6 yard skip is 4.6 cubic metres and an 8 yard is 6.1. Those are nominal and operators differ. Note it is the volume to the rim, not to the top of a heap: a skip must be level loaded to go on a road.

Can I fill a skip above the top?

No. Skips must be level loaded to travel on a public road, so anything above the rim either gets taken off before it leaves or the skip does not go. The usable volume is the volume to the top edge, which is why a skip always looks like it should hold more than it does.

Skip or grab lorry?

Past roughly fifteen cubic metres a grab lorry or a muck away contract is usually cheaper per tonne, and it does not need road space and a permit for a week. Skips win on small jobs, staged jobs, and anywhere a lorry cannot get to twice.

Do I need a permit?

If the skip is going on a public road rather than on your own drive, yes: from the council, usually arranged by the skip company, and it will want lights and markings. On a private drive you do not. That is a local question and the skip company will know it better than any calculator.