iluvfreetools
Site & safety46 of 46

Risk assessments, method statements, SWMS and job hazard analyses, for the UK, US, Australia and Canada. Finished documents, no empty boxes left for you.

All 46 ›
Structure & materials35 of 35

Steel, timber, concrete, brickwork, boards, groundworks and roofs. Section data, indicative sizing, quantities and the reference tables you normally go hunting for.

All 35 ›
Home & property32 of 32

See what it would look like before you commit, then work out what it takes. Upload a photo of your own wall, drive or house and try things on it.

All 32 ›
Invoices & docs20 of 20

Invoices, quotes, receipts and the rest of the paperwork, generated properly. No account, no watermark, and Download is the only button.

All 20 ›
Money & tax39 of 39

Wages, mortgages, tax and the everyday sums. What you actually take home, what it actually costs, and what you actually owe.

All 39 ›
People & hours46 of 46

Rotas, rosters and schedules, holiday and PTO, timesheets and staff paperwork. The admin that eats a Sunday evening, done in ten minutes.

All 46 ›
Business & marketing50 of 50

Starting up, getting found and keeping the admin straight. Everything downloadable, nothing paywalled at the last step.

All 50 ›
PDF & documents27 of 27

Merge, split, crop, sign, number and compress. Everything runs in your browser, so the contract you open here never reaches a server.

All 27 ›
Image tools24 of 24

Convert, resize, compress, crop and adjust. All of it on your own machine, with no upload, no account and no watermark on anything.

All 24 ›
Text & dates20 of 20

Word counts, case, days between dates, working days and ages. The ten-second look-ups, with no account and nothing stored.

All 20 ›
Random & party27 of 27

Secret Santa, draws, brackets, sweepstakes, printables and party quantities. The bit that is just for fun, done properly.

All 27 ›
Training & tests21 of 21

Practice tests for the cards and licences that decide whether you can work. Every answer cites the guidance it came from, not a forum.

All 21 ›

Demolition SWMS

Free. No account, no email, nothing uploaded.

Start from a trade Demolition Ticks the categories that usually apply and writes three rows to edit. It cannot know your site, your plant or your people, which is the half that decides whether the document is any good.

The one demolition forgets. Demolition crews tick almost everything, and the one that gets left is the traffic corridor. Anything coming down next to a road, a footpath or a rail line is inside the limb, and it is also the limb that decides whether you need a road closure or a permit from the council rather than just a fence.

One activity per statement. A SWMS covering everything on the job covers nothing usefully, and a reviewer will say so.
Which high risk construction work is involved 5 of 18 A SWMS is required for these specifically. Tick everything that applies: most jobs involve more than one, and the missed one is usually powered mobile plant moving nearby.
  • Queensland uses 3 metres for housing construction and 2 metres for everything else. South Australia moved from 3 to 2 metres on 1 July 2026.

The work, step by step Every task needs the last column filled in. It is the one the regulation asks for by name and the one that separates a SWMS from a method statement with an Australian title.
1
Who checks, when, and what happens if it is wrong. "As required" is what gets a SWMS sent back.
2
Who checks, when, and what happens if it is wrong. "As required" is what gets a SWMS sent back.
3
Who checks, when, and what happens if it is wrong. "As required" is what gets a SWMS sent back.
Who and where
Consulting the workers doing the work is a duty in its own right, not a formality, and a statement written without it is usually obvious to whoever reviews it.
Where it stands 3 tasks
1

thing still needed before this is a complete SWMS.

HRCW
A risk of a person falling more than 2 metres
HRCW
Demolition of a load-bearing element, or anything affecting the structure
HRCW
Disturbance of asbestos, or work likely to disturb it
HRCW
Structural alterations or repairs needing temporary support to prevent collapse
HRCW
Work in an area where powered mobile plant is moving
  • Every row here is still the example text. A SWMS has to describe the work you are actually doing, on this site, with your plant and your people, and a reviewer spots a generic one immediately. Edit the rows that nearly fit, delete the ones that do not, and add what is missing.

This produces the document. Whether it is adequate for your actual work, plant and site is the judgement of whoever prepares and signs it, and of the principal contractor who accepts it. Nothing here makes it compliant.

Built in your browser. Nothing is uploaded, no account, and the finished PDF carries your own branding rather than ours.

Worth doing

  • Nobody is recorded as consulted. Consultation with the workers doing the work is a duty in its own right, and a SWMS written without it is usually obvious to whoever reviews it.
  • Nobody is named as having prepared it.
  • No site or project named.
  • 3 tasks have nobody responsible named.

Worked out on this device, by this page. Nothing you typed was sent anywhere or stored, and closing the tab loses it.

Next in the same job

Pre-ticked for five categories, because demolition triggers more of the list than any other trade. The three rows below are a starting point for the survey, the sequence and the boundary.

A management survey is the wrong survey

There are two kinds and the difference decides whether anybody is protected. A management survey is for a building carrying on in normal use: it locates asbestos that could be disturbed by ordinary occupancy and it deliberately does not go looking inside the fabric. A refurbishment and demolition survey is intrusive, and it is the one that opens floors, ceilings and voids because something is about to be knocked down.

Turning up with a management survey and demolishing to it is the most common serious failure on this kind of job, and it is not obvious from the front page. Both documents say survey at the top. Check the type before anything is priced, because finding out afterwards means the whole site is a contaminated site.

The sequence is the control, not the exclusion zone

Structures come down in an order somebody worked out, and the order exists because removing one element changes what the rest is doing. Load paths shift, restraint disappears, and a wall that was stable an hour ago is now a free-standing panel with the wind on it.

That is why the sequence comes from an engineer for that specific structure, and why the propping goes in before the load path is removed rather than after somebody notices movement. A SWMS that describes an exclusion zone and a machine but not a sequence is describing what happens after it goes wrong.

Measure the debris envelope, not the building line

Material does not fall straight down. It bounces, it rolls, and a section pushed rather than pulled travels. An exclusion zone drawn on the footprint of the building is smaller than the area material can reach, sometimes by a lot, and it gets drawn there because the footprint is the line that is already on the drawing.

Set it from the height and the method, and re-measure it whenever either changes. Swapping a long-reach machine for a shorter one changes where the operator stands, which changes where the material lands.

The road is the limb demolition crews leave off

Demolition ticks almost everything on the list, which is exactly why the one that gets left is the traffic corridor. Anything coming down next to a road, a footpath or a rail line sits inside it, and it is also the limb that decides whether you need a formal closure or permit rather than a fence and a hope.

Dust is a neighbour problem before it is a health problem

Silica from concrete and masonry is the health hazard, and suppression at the point of generation is the control that works: a fixed supply to the machine, running as a programme rather than a hose fetched when somebody complains.

The reason it is worth designing properly is that dust leaving the boundary is the thing that generates complaints, and complaints generate visits. A site that controls dust well is usually controlling everything else well, and inspectors know that too.

Services get killed at the boundary, not at the meter

An isolation at the meter is an isolation somebody can reverse, and on a demolition site there is usually nobody left who knows the building well enough to say what a given switch does.

Disconnection at the boundary by the utility, with a certificate, is the only version that survives the machine arriving. That takes weeks to arrange with some suppliers, which is why it belongs in the programme rather than in the week before. Every genuinely serious demolition incident involving services traces back to somebody believing a supply was dead because it had been switched off.

Common questions

Is a SWMS enough for a demolition job, or do I need more?

More. The SWMS covers the high risk construction work, and above it sits the demolition plan and the engineer sequence for that structure. In several jurisdictions demolition work also needs a licensed demolisher and notification to the regulator depending on the height and method. The SWMS is the working document; it is not the permission.

Which demolition limb applies to a non-load-bearing wall?

The second one. It covers work affecting the physical integrity of the structure and it does not require the element to be carrying load, which is why soft strip and internal removals land inside the list far more often than people expect. The safest reading is that if you cannot say what the element was doing, it is inside.

Do I need the survey before pricing or before starting?

Before pricing, in practice. A refurbishment and demolition survey changes the method, the programme and the licensed removal cost, so finding it after the price is agreed turns a safety document into a commercial argument, and safety loses those more often than it should.

How is the exclusion zone decided?

From the height of the element, the method of bringing it down and the ground it lands on, rather than from the building line. It gets re-measured whenever the machine, the method or the sequence changes. A zone set on day one and never revisited is the version that ends up too small halfway through.

Can I use one SWMS for soft strip and structural demolition?

They are different activities with different hazards and usually different crews, so they are two statements. Soft strip is about what is in the building; structural demolition is about what the building is doing. Combining them produces a document that is vague about both.